INAINEXConnected Operations & Industrial IntelligenceBuilt from industry →
INAINEX RESOURCE

Industrial Integration Readiness

A pre-project checklist for connecting business systems, automation and machines safely.

Business ownershipIdentity mappingAPI and protocol capabilitySecurity boundariesFailure behaviourObservability and audit

Integration projects fail more often from unclear ownership and failure behaviour than from protocol limitations. Technical connectivity is only one part of readiness.

Business and data ownership

  • Define which system owns customer, item, project, stock, task and equipment master data.
  • Define which events are authoritative and which are derived.
  • Agree retention, audit and correction rules.

Interface capability

  • APIs: authentication, pagination, rate limits, idempotency and versioning.
  • Files: naming, location, schema, duplicate handling and archival.
  • PLCs/devices: protocol, tag ownership, command/feedback separation and heartbeat.

Failure behaviour

Define what happens when the network fails, an API times out, a PLC stops responding, or acknowledgement is uncertain. The operational answer matters as much as the software answer.

Security

Segment networks appropriately, avoid exposing control devices directly to internet-facing services, use least privilege, and log control-changing actions.

START WITH THE OPERATIONAL PROBLEM

Connect the flow that needs the most control first.

Map the current process, identify disconnected hand-offs and define a phased connected-operations roadmap.

Request an operational assessment →